Operating portfolios represent continuous, annual operating performance of represented assets, which can be for example construction works or organisations (or parts thereof).
One portfolio can only have one (1) project type. Buildings and infrastructure works cannot be in the same portfolio in any circumstances.
Setting | Impact |
Portfolio operating periods (operating portfolios only) | Portfolio will only show the chosen periods. This allows having for example 10 years of history but only showing the latest five. |
Anonymize (the project names are not shown) | All entities except ones which the viewer has themselves right to, will be shown without a name as incrementing number (Project 1, Design 1, etc). Only non-identifying information is shown. In anonymous mode, the project surface is rounded to prevent results confidentiality. |
Show only specifically allowed (design portfolios only) | If this is not chosen, shows all designs from chosen projects. If chosen, shows only the ones where “Show in portfolios” has been set. In operating portfolios, the design that has no “period qualifier” after the year is shown in the portfolios. Others can be named for example “2013 – if alternative grid mix”, and will not be shown in the portfolio. |
Display average instead of total | If this is not chosen, the portfolio shows the total of all results at bottom of the list. If this is chosen, the result is an arithmetic average of all results of the list. |
Descending order (operating portfolios only) | If this is chosen, the portfolio results will be ordered from largest to smallest (so in descending order) |
Entities | List of entities that the portfolio contains. Choose all items you wish to show in the portfolio from this list. You can only add entities for which you are an authorized user! |
Tools | List of calculation tools which are shown in the portfolio. This allows you to create a portfolio showing only a single aspect of your portfolio as opposed to all |