After you have created the company account and added yourself as the main user, click on 'Private Constructions'.
Step 2: Click on 'Add a construction/component, and choose the applicable construction
Select which construction you want to create. If you are a North American user you will have to choose TRACI. Any other user can choose CML.
Construction name
| What kind of data is available with this option?
|
European construction material: CML / Ecoinvent
| CML based data with Ecoinvent as the upstream database
|
European construction material: CML / GaBi
| CML based data with GaBi as the upstream database
|
European construction material: (Allows mixed upstream database)
| CML based data with both Ecoinvent and GaBi as the upstream databases
|
European construction material: Okobaudat
| Okobaudat data only
|
North American construction material: TRACI / Ecoinvent
| TRACI based data with Ecoinvent as the upstream database
|
North American construction material: TRACI / GaBi
| TRACI based data with GaBi as the upstream database
|
North American construction material: (Allows mixed upstream database)
| TRACI based data with both Ecoinvent and GaBi as the upstream databases
|
EPD components (Not for building LCA)
| Data for EPD product calculations only
|
Step 3: Fill in the required fields for the construction.
Fill in the required fields for the construction. Minimum required fields are
- 'Name'
- 'Unit'
- The constituents of the construction.
Field
| Specification
| Required?
|
Naming fields
| Here you can enter the name of your construction.
| Required
|
Unit
| Here you enter the unit of your construction
| Required
|
Technical specification
| Enter any information about the technical specifications
| Optional
|
Environmental data source
| Enter any information about the data source
| Optional
|
Data type
| Specify if it is generic or manufacturer specific data
| Optional
|
Country
| Specify the applicable region
| Optional
|
Type
| Specify the type of construction
| Optional
|
Service life
| Specify the service life of the construction
| Optional
|
Thickness
| Specify the thickness of the construction
| Optional, if applicable.
|
Classifications
| Specify the classification (RICS; Mat01, Bygningsdel, Rakennusosa, BSAB
| Optional
|
Comment
| Free text comment field
| Optional
|
Choosing the construction materials
| Choose which materials are included in your construction
| Required
|
Lock & Publish
| Locks your construction and publishes it
| Required for using the construction in projects
|
After you press save the construction can still be edited. If you press 'Lock & Publish' the construction will be finalized, and locked from further editing.
Step 4: Click on 'Lock & Publish' and your construction is ready for usage.
After you have locked and published the construction if will be available to you, and other users within your organisation. You will be able to find the construction with the given name in the building material query.
Managing private constructions
Managing private constructions can be done through the company account. Main users will be able to approve constructions to be added to the company account. After publishing your construction you cannot make edits anymore. If a construction needs to be edited please contact support.
Examples for using this feature
Creating concrete mixes with the private construction feature
The private construction feature can be used to create concrete mixes. As mentioned previously, for this you will need to give your construction a name, decide on the functional unit, decide on the constituents and the enter the quantities of each material. We'll give an example of what a concrete mix would look like created with the private construction feature.
(Example Ready-Mix concrete)
NameEN: Set this name so you can easily recognize your construction.
- Ready-mix concrete C20/25
Unit: Choose the functional unit. For concrete internationally this is often recorded for 1 cubic meter, in North America this is done for 1 cubic yard.
- 1 Cubic meter
Constituents: These are the ingredients that are included in the concrete mix to make the final product, concrete. These materials you can find by searching for each one in the database, regardless of which data you are using (TRACI or CML).
- Cement, 300 kg
- Water, 180 kg
- Sand 1040 kg
- Gravel 880 kg
The above is an example of the materials quantities that would be included in a calculation for 1 m3 (cubic meter) of Ready-mix concrete C20/C25 (2900/3600 psi).
If your concrete has a different strength class, or a different percentage of recycled binders, then the material quantities will be different.