Man 02: Life cycle cost and service life planning (UK NC 2014)

Man 02: Life cycle cost and service life planning (UK NC 2014)

This guidance helps you to successfully complete your calculations for BREEAM Life Cycle Costing credits in One Click LCA with our automated LCC tool. Please note that this guidance only applies to BREEAM UK NC 2014, but the LCC  tool can also be used for other schemes. 

Elemental life cycle cost (LCC)

An elemental Life Cycle Cost (LCC) analysis has been carried out, at Process Stage 2 (equivalent to Concept Design – RIBA Stage 2) together with any design option appraisals in line with ‘Standardized method of life cycle costing for construction procurement’ PD 156865:20081.
See description of Concept Design stage at https://www.ribaplanofwork.com/. The One Click LCA tool Life-cycle cost, PD 156865:2008 is set based on the British standard for life cycle costing. All the costing entries in the queries are categorized according to the standard and the results will be reported based on those categories. To calculate LCC you will need to include at least construction, operation, maintenance, occupancy and end of life costs. Customer data to be entered in One Click LCA.

In order to successfully complete your calculations for BREEAM UK Life Cycle Costing credits in One Click LCA, please follow this workflow:
  1. Create a new design and give it a name of your choice. Follow our guide on how to create a design here.

  2. Define your scope. Fill in cost data for the components that are relevant for your project.

  3. Enter your cost data in the ‘Construction and deconstruction costs’ tab. Quantity expresses the area/number for the cost element and the Unit cost expresses the cost per one unit. If you know the lump sum, add value to the Total costs. Define BCIS category to your selected LCC components in the comment row.

  4. Fill in Deconstruction costs by providing typical deconstruction cost based on the area (£/m2).

  5. Maintenance and Operating costs must be included in the ‘Operating costs’ tab. Enter the operation costs apart from utility costs under the ‘Annual operating, maintenance and repair costs’ question. Enter annually occurring maintenance and operation costs under ‘Annual operating, maintenance and repair costs’ question. Enter regularly occurring maintenance costs under ‘Periodic costs from material replacement’ and enter their occurrence frequency to the Service life field.

  6. Enter the utilities costs under the ‘Energy and water utility annual costs’ question

  7. Occupancy costs must be included in ‘Operating costs’ input form. Enter annually occurring occupancy costs under ‘Annual operating, maintenance and repair costs’

  8. In the ‘Calculation period’ input form, choose your cash flow scenario e.g. 20, 30 or 50+ years.
For your design option appraisal, you can create a copy of the design and change the cost elements or LCC calculation period and or calculation period – in this way you can work out the most cost optimal solution!

Component level LCC Plan

See description of Technical Design stage at https://www.ribaplanofwork.com/ One Click LCA tool Life-cycle cost, PD 156865:2008 is set up based on the British standard for life cycle costing. All the costing entries in the queries are categorized according to the standard and the results will be reported based on those categories. Include construction, operation, maintenance, occupancy and end-of-life costs at minimum.
  1. Create a new design and give it a name of your choice. Select RIBA stage 4. Follow our guide on how to create a design here.

  2. Include required component types to the LCC. Define for all Construction costs BCIS category in the comment row.

  3. Enter all necessary costs related to the elements as it has been done for the building.

  4. In the ‘Calculation period’ input form, choose your cash flow scenario e.g. 20, 30 or 50+ years. If you compare alternative options for the same building component, make sure that you use same calculation period and parameters.
  5. Prepare a document to demonstrate how the component level LCC plan has been used to influence building and systems design/specification to minimize life cycle costs and maximize critical value
The main difference between elemental level and component level LCC is the quality of cost data. For the element level the costs are estimates and the LCC calculations can be based on order of magnitude estimations, whereas for component level LCC cost data should be at substantive estimate level.

    • Related Articles

    • Man 02: Life Cycle Cost and service life planning (Int NC 2016)

      Life cycle cost calculation (ISO 15686-5 & EN 16627) The Life-cycle cost (CML) tool is designed in line with ISO 15686-5 and EN 16627 standards. The results will be reported based on cost categories mandatory in the EN standard. As a minimum the ...
    • Mat 01: Life cycle impacts (UK NC 2011 and 2014)

      Life Cycle Assessment for BREEAM UK NC 2011 and 2014 This guidance supports our IMPACT-compliant and IMPACT-equivalent tools (IMPACT-equivalent has since been renamed to 'LCA for BREEAM UK'), which are designed to achieve Mat 01 exemplary credits by ...
    • Mat 01: Life cycle impacts (UK NC 2018)

      Life Cycle Assessment for BREEAM UK NC 2018 This guidance supports ‘LCA for BREEAM UK’  and ‘LCA for BREEAM UK IMPACT-compliant’ tools, which are designed to achieve BREEAM Mat 01 seven credits and three exemplary credits. For BREEAM UK NC 2011 and ...
    • Automated LCC tool (CML method)

      This guidance helps you to successfully complete your calculations for Life Cycle Costing analysis in One Click LCA with the automated LCC tool. One Click LCA “Life-cycle cost, automated” tool is designed in line with EN 16627 and ISO 15686-5 and ...
    • Service update log

      23 July 2020 - Significant updates in the Swedish template of the concept phase tool, Carbon Designer Carbon Designer's Swedish template has now 7 new assemblies, 10 additional material alternatives in the existing assemblies, and updated reference ...